Pioneer Lodge - Gerringong

$250,000.00

4 months

Description of Work:

Pioneer Lodge is an aged care facility in Gerringong which proved to be a fun and challenging job with a partial demolition of the pre-existing building to enable the alterations by PBS Building to bring to life the new facility. This involved a strip-out of the entire top-floor by our skilled team using heavy machinery. As a result of this contaminants were recognised and tested meaning the remediation of the site was imperative for further work. Our skilled team of removalists and demolition experts removed the asbestos and disposed of before site remediation took place. As a result of our highly skilled teams work in the demolition and remediation, the site was ready for the construction team to steam ahead. The Pioneer Lodge job was completed by our team in 4 months and cost $250,000.00.

Summary of Work:

  • Asbestos testing and containment onsite
  • Asbestos removal from site and disposal of under EPA guidelines
  • Strip out and alteration of existing building
  • Demolition of existing building
  • Remediation of site from all contaminants
  • Develop and implement workplace health and safety, and environmental management practices

In need of our services?

Need some work done soon? Call (02) 4243 7574 and we’ll give you an obligation free quote and work with you to find the solution that best fits your budget and time frame